What to Do After You Receive T1 Samples from Your Mold Supplier
5/30/20251 min read


Receiving your first T1 mold trial samples is an exciting step—but what happens next? At Dongxinda, we guide our clients through the post-T1 phase to ensure a smooth transition to full production.
Key Steps After Receiving T1 Samples:
Dimensional Review: Compare sample measurements against 2D drawings or CAD models.
Appearance Check: Look for flow lines, sink marks, or weld lines on cosmetic surfaces.
Fit & Function Test: Assemble the parts or test them in real use scenarios.
Feedback Submission: Share any issues or adjustments required (e.g., flash, tight fit, draft marks).
Dongxinda’s engineers will then review your feedback, evaluate potential causes, and—if needed—modify the mold before T2.
FAQs:
What if part dimensions are out of tolerance?
We’ll adjust the cavity/core or cooling layout and provide a new T2 sample at no cost.Can you help with assembly problems?
Yes, we analyze mating issues and can suggest draft or clearance changes.Is a T2 or T3 trial always necessary?
Not always—many molds pass T1. But complex parts may need 1–2 rounds of optimization.
One-stop service for all your molding needs.
contact information
+65 80391511
+86 13860465777
© 2024. All rights reserved.